Palm River Handover Standards: Specifications, Materials & Brands
Content reviewed by Ms Khả Hân, co-founder of DnD Realty with more than 10 years in high-end property.
- Handover Package: Standard apartments are delivered with fully finished wall-attached specifications, requiring only loose furniture before occupancy.
- Bare-Shell Specialty Units: Penthouses on level 35 and two-story duplexes are delivered in bare-shell condition for bespoke interior design.
- Brand Portfolio: Integrated fixtures feature international brands including Bosch, Hafele, Kohler, Duravit, Schneider, and Daikin.
- Building Envelope: Double-glazed Low-E glass installations reduce solar heat transfer and block up to 95% of ultraviolet radiation.
- Warranty Protection: Delivered mechanical and electrical equipment includes manufacturer warranties ranging from 12 to 24 months.
The Palm River handover standards establish premium wall-attached specifications across standard 2-bedroom and 3-bedroom residences. Delivered items include double-glazed Low-E windows, Daikin concealed multi-split air conditioning, integrated European kitchen appliances, and Kohler sanitary ware. In contrast, penthouses and duplex residences are delivered in bare-shell condition for custom interior architecture.
For international buyers and overseas Vietnamese evaluating property in Ho Chi Minh City, understanding handover annexes prevents unexpected fit-out expenses. This guide details material schedules, technical parameters, brand appointments, and practical inspection protocols.
Overview of Palm River Handover Specifications

Standard condominium units at Palm River are handed over under a fully finished wall-attached standard. The developer delivers complete floor finishes, plaster ceilings, recessed lighting, fully equipped bathrooms, and integrated kitchen cabinetry.
Purchasers need only install loose furniture such as beds, sofas, dining tables, and entertainment systems before moving in or renting to expatriate tenants. Podium garden residences on levels 3A and 5 also receive complete interior fit-outs alongside dedicated private garden terraces.
Material Schedule and Brand Specification Schedule
The contractual handover annex defines 10 core finishing groups and appointed manufacturers:
| Functional Area | Delivered Material | Appointed Brand | Technical Specifications |
|---|---|---|---|
| Main Entrance Door | Engineered timber fire-rated door (70 minutes) | An Cuong / Porta Doors | Fire-resistant mineral core with acoustic perimeter rubber seals |
| Door Access Lock | Smart electronic digital lock with 4 access modes | Yale / Hafele | Fingerprint recognition, numeric keypad, RFID card, and mechanical key |
| Living Room Floor | Semi-polished porcelain tiles (80×80 cm) | Eurotile / Dong Tam | Slip-resistant, stain-resistant, anti-bacterial treated surface |
| Bedroom Floor | Moisture-resistant engineered wood flooring (12 mm) | Kronopol / Quickstep | AC5 commercial scratch resistance rating, Formaldehyde E1 certified |
| Windows & Balcony | Double-glazed thermal-break Low-E glass units | Schuco / Eurowindow | Powder-coated architectural aluminum frames with solar heat barrier |
| Kitchen Cabinetry | Upper and lower moisture-resistant MDF cabinets | Casta / An Cuong | Melamine finish, Blum soft-closing concealed hinges, integrated pull handles |
| Countertop & Backsplash | Engineered quartz stone and tempered glass backsplash | Vicostone | Non-porous scratch-resistant stone, easy-clean heat-resistant glass |
| Kitchen Appliances | Built-in induction cooktop and extraction hood | Bosch / Hafele | Schott Ceran ceramic glass, 750 m³/h extraction ventilation capacity |
| Sanitary Ware | Smart toilet, washbasin, and thermostatic concealed shower | Kohler / Duravit | Anti-bacterial glaze, electronic bidet seat, thermostatic anti-scald valve |
| Air Conditioning | Multi-split ducted and concealed air conditioning | Daikin / Mitsubishi Heavy | Inverter compressor technology for high energy efficiency |
Living Room and Balcony Finishing Standards

Living rooms feature ceiling clearances of roughly 3.2 meters to concrete slabs, finished with suspended moisture-resistant gypsum boards and three coats of premium Dulux paint. Recessed energy-saving LED downlights are pre-wired throughout the living and dining zones.
Large sliding glass doors open onto private river-facing balconies. Balcony railings stand 1.4 meters high using structural tempered glass and stainless steel handrails, meeting safety codes for high-rise family residences.
European Kitchen Appliances and Cabinetry Details
Kitchen layouts are configured for functional workflow with custom-fitted upper and lower cabinetry. Cabinets feature moisture-resistant carcasses, concealed Blum soft-close hinges, and cutlery organizer trays.
The cooking zone includes a double or triple-zone induction hob paired with a ducted range hood. Kitchen sinks are fabricated from heavy-gauge SUS 304 stainless steel with sound-deadening undercoating and 360-degree swivel mixer taps from Kohler.
Bedroom Flooring and Acoustic Glazing Standards
All bedrooms feature imported European engineered timber flooring with an AC5 commercial wear rating. Flooring materials comply with European E1 emission standards, ensuring low chemical emissions for living spaces.
External windows incorporate double-glazed Low-E glass units separated by an insulating air gap. This window engineering reflects external solar radiation, blocks 95% of ultraviolet light, and dampens outside urban acoustic transmission.
Bathroom Sanitary Appointments and Master Suites

Bathrooms are tiled from floor to ceiling with non-slip porcelain tiles. Master bathrooms are equipped with one-piece Kohler toilets, electronic bidet washlet seats, and dual-function thermostatic rain shower columns enclosed by 10 mm tempered glass screens.
In the 3-bedroom Luxury floor plan measuring 157 m² gross area, the master ensuite includes double vanity basins and a freestanding acrylic soaking tub overlooking the river. Room arrangements are shown in our guide to Palm River floor plans.
Electrical Infrastructure and Multi-Split Air Conditioning
Electrical fixtures throughout each residence utilize Schneider Electric slimline switches and international socket outlets with child-protection shutters. Master electrical distribution boards include residual current circuit breakers (RCCB) for electrical fire prevention.
Climate control is provided by Daikin or Mitsubishi Heavy multi-split air conditioning systems. The living and dining areas feature concealed slim-duct ceiling indoor units, while bedrooms feature quiet indoor fan-coil units connected to centralized exterior condenser decks.
Equipment Warranties and After-Sales Support

All delivered equipment and built-in appliances carry manufacturer warranty coverage ranging from 12 to 24 months from the official handover date. Building management coordinates maintenance requests through a dedicated resident customer portal.
The developer provides long-term building structural guarantees under Vietnamese construction laws. Buyers can inspect physical finishes in person by visiting the project sales gallery, detailed in our report on the Palm River show unit and Sales Gallery.
Practical 5-Step Handover Inspection Checklist
When attending physical apartment handovers, buyers should conduct a structured inspection:
- Compare Contract Annexes: Check every installed appliance and brand name against the legal sales contract annex.
- Test Flooring and Wall Surfaces: Verify levelness across porcelain tiles and inspect engineered timber joints for gaps or hollow sounds.
- Inspect Drainage and Water Pressure: Run all showerheads and faucets simultaneously to test water pressure and check floor drain gradient slopes.
- Test Electrical and AC Systems: Power on all air conditioning units, induction cooktop burners, range hoods, and digital smart locks.
- Review Statutory Paperwork: Ensure the official apartment handover record documents any minor aesthetic snags before signing formal acceptance papers.
Explore more projects with DND Realty
Updated 16.11.2026Palm River Project OverviewPalm River at Palm City, Binh Trung Ward, Thu Duc: 1.9 ha with 4 towers of 35–36 storeys and 704 units, Onsen and sky-level amenities, plus legal status and construction progres…Read in Vietnamese
Updated 12.11.2026Huong Viet Properties ProfileDiscover the Palm River developer, Huong Viet Properties, and Keppel Land alliance. Review completed projects, financial standing, and buyer guarantees.Read in Vietnamese
Updated 16.11.2026Palm River Floor PlansReview the official Palm River floor plan guide. Compare studio to 3-bedroom luxury layouts and low-density floor plates in Palm City, Thu Duc City.Read in Vietnamese
Updated 12.11.2026Palm River Price & Payment PlanExplore Palm River price ranges from 12.29 billion VND, 145 million/m², 4 payment pathways, discounts up to 13%, and 24-month interest support packages.Read in Vietnamese
Updated 12.11.2026Palm River Penthouse & DuplexExplore the Palm River penthouse and duplex collection in Palm City: 4 penthouses, 18 duplex units, expected prices, floor plans, and bare-shell handover.Read in Vietnamese
Updated 12.11.2026Vietnam Property Guide for ForeignersCan foreigners buy property in Vietnam? Learn 2026 legal rules, the 30% condo quota, 50-year tenure, payment steps, and overseas Vietnamese ownership rights.Read in Vietnamese Frequently Asked Questions
Are Palm River apartments delivered fully finished or in bare shell?
Which brands provide the sanitary ware and kitchen appliances?
Do balcony and window glass assemblies provide solar thermal protection?
Can owners customize their apartment interiors after taking handover?
How long do equipment warranties last on delivered fittings?
Contact DND Realty for Handover Specifications
To obtain complete technical finishing schedules or arrange an inspection tour of the Palm River show units, contact our advisory team:
- Hotline / WhatsApp / Zalo: (+84) 0906.873.708
- Email: info@dndrealty.com.vn
- Head Office: 60 Phan Ba Vanh, Thanh My Loi Ward, Ho Chi Minh City, Vietnam
- Sales Gallery: Song Hanh Road, Palm City, Binh Trung Ward, Ho Chi Minh City
- Project Profile (EN): Palm River Project Overview