Actual photo
Rendering
Actual photo
Actual photo
1 / 4
Project snapshot
Overview of The Global City
- Total master-planned scale reaches about 117.4 ha on Do Xuan Hop Street, former An Phu Ward.
- 1/500 detailed planning approved under Decision 6296/QĐ-UBND dated 30/11/2015 of the HCMC People’s Committee.
- Developed by Masterise Homes, with architectural master planning by Foster + Partners.
- Construction officially started on 18/03/2021 with a multi-product township mix.
- Grade A shopping mall of about 123,000 m² floor area serving the wider region.
East HCMC is forming large townships backed by connected road infrastructure. This township project is developed by developer Masterise Homes on a large land bank in former District 2, combining residential precincts, commercial services and riverside green space.
The master plan creates an organized living environment for an urban resident community.
1. Scale overview and legal dossier of The Global City
The project originated legally under the name Saigon Binh An Urban Area. The HCMC People’s Committee approved the investment policy in January 1999 and allocated the land to SDI Corp in January 2001. Masterise Homes took over the project around August 2021 and announced the new commercial name in late January 2022.
The 1/500 detailed planning dossier was officially approved under Decision No. 6296/QĐ-UBND dated 30/11/2015 of the HCMC People’s Committee. Covering a total area of about 117.4 ha, the project officially broke ground on 18/03/2021.
The product mix includes high-rise apartments, low-rise townhouses, villas, social housing, healthcare, administrative facilities and a shopping mall. The renaming process and legal history of the land bank were reported in detail by Dan Tri.

2. Road links on Do Xuan Hop and Lien Phuong streets
The township fronts Do Xuan Hop Street in former An Phu Ward, Thu Duc City, HCMC, and borders Lien Phuong Street directly.
This location forms a regional transport node between central HCMC and neighbouring satellite towns. The Lien Phuong radial road supports internal circulation and direct travel to adjacent wards.
From here, residents can commute to the Thu Thiem urban area and District 1 via Mai Chi Tho Boulevard. Surrounding road infrastructure is being upgraded in tandem to handle high traffic volumes.
3. Foster + Partners architectural planning at The Global City
Masterise Homes formed a strategic partnership with Foster + Partners, the UK architectural design practice, which is the master planning consultant for the entire project.
The urban plan focuses on sustainability by pairing built structures with natural elements. Tree cover, water surfaces and pedestrian paths are distributed across all precincts.
Details of the architectural partnership were reported by CafeLand during the initial development phase.

4. Functional precincts at The Global City
The township is divided into multiple development phases with dedicated high-rise and low-rise residential lines. The table below summarizes the status of precincts officially announced in the press.
Summary of progress and published status by precinct
| Precinct name | Product scale | Information source | Published status |
|---|---|---|---|
| Masteri Grand View | About 600 apartments (57–181 m²), Do Xuan Hop – Lien Phuong intersection | Thanh Nien 12/11/2024 | Launched, handover expected in 2026 |
| Lumière Midtown | 2 towers of 23 storeys, 2 basements, 4 podium floors, 808 apartments on Lien Phuong Street | VnExpress 26/05/2025 | Officially launched |
| Masteri Cosmo Central | 6 towers of 19–29 storeys, commercial units, 1–4BR apartments, Duplex, Penthouse, office tower | Dan Tri 18/01/2026 | Officially launched |
| New high-rise precinct | Expected launch in November 2026, specifications pending | Indicative developer information | Awaiting developer documents |
Buyers can read more about the Masteri Cosmo Central location. In addition, the Masteri Cosmo Central amenities cover a wide range of daily activities.
Buyers can also review the Masteri Cosmo Central legal dossier and Masteri Cosmo Central floor plans.
5. Large-scale amenities serving township residents
The township integrates coordinated facilities that serve both residents and visiting shoppers.
Grade A shopping mall of about 123,000 m² floor area
The central shopping mall has a floor area of about 123,000 m², serving retail and entertainment needs across the wider district.
This commercial floor area was reported by VnExpress when covering the high-rise launch.

Musical water canal and riverside park
The township has an artificial canal system paired with outdoor musical fountain shows, forming a cool landscaped corridor through the central zone.
The riverside park and waterside walkways give residents space to unwind after work, complemented by elevated infinity pools and commercial podiums at the apartment towers.

6. New high-rise precinct expected in November 2026 at The Global City
The township is expected to introduce a new high-rise precinct in November 2026, continuing Masterise Homes’ high-rise apartment line in East HCMC.
Information timeline for the late-2026 high-rise precinct
The official name and unit count of this precinct have not yet been announced, and detailed specifications await official developer documents. Buyers can follow the Masteri Cosmo Central construction progress article to track on-site work.
Our team will update the page as soon as the developer releases official sales materials. Buyers can contact us directly to schedule a visit and receive early briefing documents.
7. Which buyer groups should consider The Global City?
Spanning 117.4 ha with coordinated infrastructure, the township suits both owner-occupiers and long-term investors.
Specialists working at the Hi-Tech Park or Thu Thiem have a practical commute from here, while the green spaces and water features suit families with young children.
Buyers can read the Masteri Cosmo Central vs. Gladia Heights comparison, as well as the Masteri Cosmo Central vs. Eaton Park comparison for a broader perspective.
The developer’s high-rise launch strategy was also analyzed by Thanh Nien.
Key figures
Documents on file
Legal: The Global City
Legal files are being updated
Legal status follows the developer timetable: 1/500 master plan: Decision 6296/QĐ-UBND dated 30/11/2015. Scans and official decisions will be posted when the developer releases them.
Payment terms
Payment policy & price list: The Global City
Payment policy and price list are being updated
Official offers, payment methods and the unit list are released by launch phase. Contact a DND Realty consultant for the current price list and a priority booking.
FAQ
8. Frequently asked questions about The Global City township
Which decision approved the 1/500 detailed planning?
When did construction of the project officially start?
How large is the shopping mall inside the township?
Which high-rise apartment precincts have officially launched?
How can buyers book a site visit?
Register now
View The Project
And Unit Mix
Leave your details to receive the project pack, official price list and current developer offers from DND Realty.
Hotline 24/7
0906.873.708
Head office
60 Phan Ba Vanh Street, Thanh My Loi Ward, Ho Chi Minh City