Project news

Palm River Location: Palm City Connectivity, Travel Times & Infrastructure Map

By DnD Realty
Vị trí Palm River giữa hệ sinh thái dự án khu Đông TP.HCM nhìn từ trên cao

Content reviewed by Ms Lê Hiền, co-founder of DnD Realty with more than 10 years in high-end property.

Key Takeaways
Updated 13/11/2026 · Source: Field survey by DND Realty & official planning records
  • Core location: Fronting the Song Hanh parallel road inside Palm City urban area, Nam Rach Chiec residential zone, Binh Trung Ward (formerly An Phu), Ho Chi Minh City.
  • Quick travel times: About 4.2 km (5 to 7 minutes) to Thu Thiem Financial Center, and about 7.5 km (10 to 12 minutes) to District 1 via Saigon River Tunnel.
  • Peninsula microclimate: Wrapped by about 2.7 km of Giong Ong To River frontage, lowering average local temperature by 2 to 3 degrees Celsius.
  • Infrastructure catalysts: Benefits directly from completed Song Hanh parallel road, the ongoing 3-level An Phu Interchange, and Ba Dat 2 Bridge (broke ground on October 31, 2026).
  • Walkable international education: The American School (TAS) sits about 500 meters away inside Palm City, reachable within a 2 to 3-minute walk.

The Palm River location sits on the Song Hanh parallel road within the 30-hectare Palm City urban area, Nam Rach Chiec, Binh Trung Ward, Ho Chi Minh City. With about 2.7 km of riverfront along Giong Ong To River and direct links to Mai Chi Tho Boulevard, the project offers fast access to Thu Thiem and District 1.

1. Exact Coordinates of Palm River on the Map

Palm River sits on Song Hanh Road, the parallel road of the Ho Chi Minh City – Long Thanh – Dau Giay expressway. It is inside Palm City, Nam Rach Chiec residential quarter, Binh Trung Ward (former District 2 area), Ho Chi Minh City. This 1.9-hectare parcel forms the riverfront phase of the master-planned Palm City development.

Planning map showing Palm River connectivity in East Ho Chi Minh City
Strategic connectivity map of Palm River among key developments in East Ho Chi Minh City.

The land plot forms a natural peninsula surrounded by water on three sides. Because of this layout, residential towers enjoy open views over the river without risk of future obstruction.

2. Travel Times and Distances to Key Destinations

DND Realty recorded actual driving times from Palm River during normal traffic conditions:

Destination Distance Travel Time Main Route
Thu Thiem Financial Center About 4.2 km About 5–7 minutes Mai Chi Tho Boulevard
Ben Thanh Market, District 1 About 7.5 km About 10–12 minutes Saigon River Tunnel / Ba Son Bridge
Thao Dien Expat Ward About 3.8 km About 7–9 minutes D3 Road – Luong Dinh Cua
Saigon Hi-Tech Park (SHTP) About 6.5 km About 10–12 minutes Vo Chi Cong / Ring Road 2
The American School (TAS) About 500 m About 2–3 minutes Walk within Palm City campus
American International Hospital (AIH) About 2.0 km About 4–5 minutes Nguyen Hoang Street
Tan Son Nhat International Airport About 14.0 km About 25–30 minutes Mai Chi Tho / Pham Van Dong
Long Thanh International Airport About 32.0 km About 35–40 minutes Expressway to Long Thanh

3. Direct 5-Minute Connection to Thu Thiem New Urban Area

Residents reach the center of Thu Thiem by driving down Mai Chi Tho Boulevard. The multi-lane boulevard provides smooth traffic flow even during morning rush hours.

Mai Chi Tho Boulevard connecting Palm River directly toward Thu Thiem
Mai Chi Tho Boulevard reduces driving time to Thu Thiem to about 5 to 7 minutes.

Thu Thiem accommodates prime Grade-A office towers, central plazas, and international cultural venues. Living at Palm River allows professionals to reach these offices in about 5 minutes without facing heavy inner-city congestion.

4. Driving to District 1 via Saigon River Tunnel in under 10 Minutes

Commuting to central District 1 takes about 10 to 12 minutes through the Saigon River Tunnel. The overall distance measures approximately 7.5 km along Mai Chi Tho Boulevard.

Drivers also have the alternative option of using Ba Son Bridge to access Ton Duc Thang Street directly. This dual connectivity makes Palm River an attractive address for corporate managers working in the central business district.

5. Routes to Tan Son Nhat and Long Thanh International Airports

Palm River connects efficiently to both major airports serving southern Vietnam. To Tan Son Nhat Airport, drivers travel along Mai Chi Tho Boulevard and Pham Van Dong Expressway, taking about 25 to 30 minutes.

For trips toward Long Thanh Airport, vehicles merge directly onto the expressway from Song Hanh road. The 32 km drive takes about 35 to 40 minutes once the international airport starts commercial operations. Regular business travelers benefit noticeably from this expressway ramp access.

6. Peninsula Setting Wrapped by 2.7 km of Giong Ong To River

Very few residential developments in Ho Chi Minh City feature a 2.7 km natural river bend. The wide water surface of Giong Ong To River cools incoming breezes year-round.

Riverside park along Giong Ong To River wrapping the Palm River compound
Green riverside park along Giong Ong To River providing natural ventilation and open views.

Microclimate readings inside Palm City show temperatures roughly 2 to 3 degrees Celsius lower than in dense downtown neighborhoods. The green buffer along the riverbank also blocks urban noise and road dust.

7. Impact of Nam Rach Chiec Urban Planning

Nam Rach Chiec was planned as a modern, low-density ecological urban area. Established developments such as Palm City, Palm Heights, and Lakeview City form an orderly residential cluster with complete internal roads and utilities.

As the remaining parcels complete development, neighborhood infrastructure connects into a continuous riverfront community. Learn more about the overall master plan in our guide to the Palm River project overview.

8. Infrastructure Momentum from Song Hanh Parallel Road

The Song Hanh parallel road along the expressway is now open to traffic. This separated multi-lane roadway keeps urban traffic away from heavy container trucks running on the main expressway lanes.

Song Hanh parallel road passing in front of Palm River
The completed Song Hanh parallel road provides convenient access for residents.

Furthermore, the construction of Ba Dat 2 Bridge officially broke ground on October 31, 2026. Once finished, Ba Dat 2 Bridge will expand roadway capacity across the canal, linking Palm City smoothly to surrounding quarters.

9. Traffic Relief from the 3-Level An Phu Interchange

Located about 1 km west of Palm River, the An Phu Interchange is entering its final construction stages. The design includes three tiers: underpass tunnels, at-grade roundabouts, and elevated flyover ramps.

When fully open, this interchange will eliminate the long-standing bottleneck at Mai Chi Tho and Luong Dinh Cua. Seamless vehicle distribution through the junction supports healthy property value growth throughout Nam Rach Chiec.

10. Direct Access to Metro Line 1 (Ben Thanh – Suoi Tien)

From Palm River, residents reach An Phu Metro Station on Vo Nguyen Giap Highway in about 5 minutes by car or motorbike. Metro Line 1 provides rapid, weather-independent transit into District 1 and Binh Thanh.

Urban mass transit access reduces dependence on private cars for daily city trips. Real estate located within a 5 to 7-minute radius of metro stations consistently records stable tenant demand and higher occupancy rates.

11. Proximity to Renowned International Schools (TAS, AIS)

Families with school-age children find several established international schools within easy reach. The American School (TAS) operates right inside the Palm City township, approximately 500 meters from Palm River.

Australian International School (AIS) and British International School (BIS) sit about 5 to 7 minutes away by car. Children can walk or take a brief bus ride to school, saving significant commuting time each morning.

12. International Healthcare Facilities Meeting JCI Standards (AIH)

Comprehensive medical care is available close to home. American International Hospital (AIH), located on Nguyen Hoang Street, is about 2.0 km from Palm River.

AIH holds JCI accreditation, a recognized benchmark for international healthcare quality and patient safety. Other nearby facilities include Thao Dien Medical Center and Family Medical Practice along Xuan Thuy.

13. Shopping and Entertainment Hubs Nearby

Retail, dining, and grocery needs are well supported by existing shopping centers. Estella Place, Vincom Mega Mall Thao Dien, and Mega Market An Phu all operate within a 3 km driving radius.

These malls feature international grocery stores, cinema complexes, boutique retail, and family dining. Residents enjoy city-level convenience while living in a tranquil riverfront setting.

14. D3 Road Connecting Mai Chi Tho and Do Xuan Hop

The planned D3 road serves as a secondary arterial connecting Nam Rach Chiec toward The Global City and Do Xuan Hop Street. This route links Palm River directly to the musical fountain canal and the SOHO commercial street.

This cross-district link creates an integrated commercial corridor across East Ho Chi Minh City. Check payment terms and sales updates in our guide to Palm River price and payment plans.

15. Long-term Value of Riverside Property in Nam Rach Chiec

Available riverfront land within a 15-minute drive of central Ho Chi Minh City is becoming scarce. Residential land plots with broad water frontage like Palm River cannot be duplicated in interior urban zones.

Living environment along Giong Ong To River at Palm River
Natural riverfront setting offers sustainable long-term value for homeowners.

Natural water frontage combined with completed expressway infrastructure provides steady support for capital value over the investment lifecycle. Properties in this pocket appeal consistently to both owner-occupiers and long-term rental investors.

16. Practical Strengths and Points to Note About Palm River Location

DND Realty summarizes the practical advantages and current trade-offs of the site based on actual field inspections:

Key strengths include the quiet peninsula geography, generous river frontage, and direct walking distance to TAS international school. The setting provides a calm living atmosphere that contrasts sharply with dense urban roads.

Points to keep in mind include localized traffic slowdowns along Song Hanh road during afternoon school pick-up hours. However, the completion of the An Phu Interchange and Ba Dat 2 Bridge will disperse these traffic streams substantially.

17. Recommended Driving Routes for Field Visits

Prospective buyers traveling to examine the Palm River site and sales gallery can choose between two main routes:

Route 1 from District 1: Travel through Saigon River Tunnel, follow Mai Chi Tho Boulevard eastward, turn right onto Song Hanh parallel road, and continue about 800 meters to Palm City.

Route 2 from Thao Dien: Take Luong Dinh Cua Street across the D3 access corridor into Palm City. For visiting hours and model home registration, review our guide to the Palm River show unit and sales gallery.

18. Frequently Asked Questions About Palm River Location

What is the exact address of Palm River?

The project is located on the Song Hanh parallel road, inside Palm City urban area, Nam Rach Chiec, Binh Trung Ward (former District 2), Ho Chi Minh City.

How long does it take to drive from Palm River to Thu Thiem?

The driving distance is about 4.2 km along Mai Chi Tho Boulevard, taking approximately 5 to 7 minutes under regular traffic conditions.

Does expressway traffic create noise or air pollution at Palm River?

No. Palm River sits inside the inner river bend of Palm City, shielded by wide landscaped green belts and 2.7 km of riverbank, keeping living areas peaceful.

Which international schools are closest to Palm River?

The American School (TAS) is about 500 meters away inside Palm City, while AIS and BIS are reachable within a 5 to 7-minute drive.

19. Location Comparison: Palm River vs. Eaton Park and The Privé

Here is an objective comparison of location and connectivity features among key high-end developments in the area:

Location Feature Palm River Eaton Park The Privé
Water Frontage About 2.7 km river bend Ba Dat canal frontage 3 River sides
Distance to Thu Thiem About 4.2 km (5–7 min) About 3.5 km (4–5 min) About 4.5 km (6–8 min)
School Proximity TAS inside campus (500 m) About 1.5 km away About 1.2 km away

Explore more projects with DND Realty

Palm River Official OverviewUpdated 16.11.2026Palm River Official OverviewPalm River at Palm City, Binh Trung Ward, Thu Duc: 1.9 ha with 4 towers of 35–36 storeys and 704 units, Onsen and sky-level amenities, plus legal status and construction progres…Read in Vietnamese Palm River Floor PlansUpdated 16.11.2026Palm River Floor PlansReview the official Palm River floor plan guide. Compare studio to 3-bedroom luxury layouts and low-density floor plates in Palm City, Thu Duc City.Read in Vietnamese Palm River vs Eaton ParkUpdated 14.11.2026Palm River vs Eaton ParkPalm River vs Eaton Park in East HCMC: compare riverfront and Mai Chi Tho locations, prices from 125-150 million VND/m², legal files, and 2027 handover.Read in Vietnamese Palm River vs The PrivéUpdated 18.11.2026Palm River vs The PrivéPalm River vs The Privé in Nam Rach Chiec: compare 5%-10% upfront equity, MB Bank loans, 13%-23.5% fast-payment discounts, and Q3/2027 handover dates.Read in Vietnamese Palm Heights OverviewUpdated 21.10.2026Palm Heights OverviewPalm Heights in Palm City, District 2: Handed over with vibrant expat community, 2BR 77 m² unit at VND 7.5B all-in, 50m resort pool. Hotline 0906.873.708.Read in Vietnamese Apartments for Rent in District 2Updated 18.11.2026Apartments for Rent in District 2Review apartments for rent District 2 across Thao Dien, An Phu & Nam Rach Chiec. Rents from 10M to 75M+ VND, yields 4.8%–5.5%, and upcoming pipeline.Read in Vietnamese Vietnam property rules compared for overseas Vietnamese, foreign individuals and foreign organisations in 2026.Updated 12.11.2026Buying Property in Vietnam as a ForeignerCan foreigners buy property in Vietnam? Learn 2026 legal rules, the 30% condo quota, 50-year tenure, payment steps, and overseas Vietnamese ownership rights.Read in Vietnamese Rental Yield in East Ho Chi Minh CityUpdated 18.11.2026Rental Yield in East Ho Chi Minh CityReview rental yield Ho Chi Minh City across 25 projects in the East. Gross yield range from 2.91% to 7.88%, project breakdown, and net cash flow calculations.Read in Vietnamese

Visiting Palm River Site with DND Realty

To inspect the actual construction site, walk the riverfront park, or visit the sales gallery, schedule a private tour with DND Realty:

DND REALTY — STRATEGIC CONSULTANT FOR PALM RIVER

Hotline / WhatsApp / Zalo: 0906.873.708

Consulting Office: 60 Phan Ba Vanh, Thanh My Loi Ward, Ho Chi Minh City

Palm River Sales Gallery: Song Hanh Road, Palm City, Binh Trung Ward, Ho Chi Minh City (Plus code QQV5+68)

Project Overview: Palm River Project Page

Contact Page: https://dndrealty.com.vn/lien-he/

Recommendation from DND Realty property experts

Visit Palm City at peak hours to test your daily commute along Song Hanh Road before deciding.

Hotline / Zalo: +84 906 873 708
Address: 60 Phan Ba Vanh Street, Thanh My Loi Ward, Ho Chi Minh City
Zalo ZALO +84 906 873 708