Project news

Palm River vs Eaton Park: Which Project to Choose in 2026?

By DnD Realty
Phối cảnh 4 tòa tháp căn hộ ven sông Palm River Nam Rạch Chiếc

Content reviewed by Ms Lê Hiền, co-founder of DnD Realty with more than 10 years in high-end property.

When researching apartments in East Ho Chi Minh City, a Palm River vs Eaton Park comparison helps buyers distinguish between two living environments: high-rise apartments on Mai Chi Tho Boulevard and riverfront apartments along the Giong Ong To River in Binh Trung Ward. DND Realty compares the location, scale, legal status, and construction progress of both projects.

Summary

Comparing Palm River and Eaton Park helps buyers weigh boulevard-front high-rise apartments against riverfront living in East Ho Chi Minh City.

  • Location: Eaton Park fronts Mai Chi Tho Boulevard near the An Phu Interchange; Palm River is inside Palm City along the Giong Ong To River, Binh Trung Ward.
  • Developer: Eaton Park is developed by Gamuda Land; Palm River is co-developed by Hướng Việt Properties and Keppel Land.
  • Scale: Eaton Park has 6 towers of 29 to 39 storeys (1,968 apartments); Palm River has 2-bedroom corner (85 m²) and 3-bedroom corner (157 m²) show units.
  • Progress: Eaton Park topped out all 6 towers on 12/08/2026, with towers A5-A6 expected for handover in Q2/2027 and towers A1-A4 expected in Q1/2028 according to DND Realty’s site records in 10/2026; Palm River opened its show units on 18/09/2026.
  • Indicative price: Eaton Park ranges from 125 to 150 million VND/m²; Palm River starts from about 145 million VND/m² gross area (excluding VAT, maintenance fee and discounts), with 2-bedroom units from 12.29 billion VND per the DND inventory of 15/10/2026.
Updated 14/11/2026 · Sources: EATON PARK PHASE 3’S Q&A; Vietnam Law Newspaper dated 13/08/2026; Palm River developer documents.

Palm River vs Eaton Park: 8 planning and legal criteria in 2026

The table below compares the main technical and planning criteria between the two projects in 2026:

Criterion Palm River Project Eaton Park Apartments
Project location Palm City urban area, Nam Rach Chiec, Binh Trung Ward, Thu Duc City Mai Chi Tho Boulevard frontage, near An Phu Interchange, HCMC
Developer Hướng Việt Properties and Keppel Land Gamuda Land (Malaysia)
Site scale Apartment precinct within Palm City urban area 3.7 ha land plot
Product types Riverfront apartments (show units: 2BR corner 85 m², 3BR corner 157 m²) 6 towers of 29 to 39 storeys, 1,968 apartments, 52 podium shops, 20 shophouses
Architecture & exterior glass Apartment design along the Giong Ong To River Biophilic design; sliding doors and windows use Low-E heat-insulating glass per Phase 3 documents
On-site amenities Landscaped amenities connected to the riverfront water space Level 3 utility rooms, swimming pool, and gardens; areas per Phase 3 documents
Indicative price From about 145 million VND/m² gross area (excluding VAT, maintenance fee, discounts); 2BR from 12.29 billion VND Around 125 to 150 million VND/m²
Progress & handover Show units opened 18/09/2026; handover expected Q1/2029 Topped out 6 towers on 12/08/2026; towers A5-A6 expected Q2/2027, towers A1-A4 expected Q1/2028

Palm River vs Eaton Park: location and transport links

Palm River vs Eaton Park location and planned transport routes
Location diagram of Palm River, Eaton Park, and nearby projects. Palm River prices start from about 145 million VND/m² gross area, excluding VAT, maintenance fees, and discounts, per the 15/10/2026 inventory sheet. Future transport routes shown on the image reflect planning information and are not yet in operation.

Geographic location is the clearest difference between the two projects. Eaton Park fronts Mai Chi Tho Boulevard. This main arterial road connects directly to the Saigon River Tunnel and the Thu Thiem New Urban Area. Residents can reach commercial and service areas in the city centre along this route.

Palm River vs Eaton Park: photo of Eaton Park towers under construction
Eaton Park towers and the construction site in front, from the project library. The image records conditions at the time it was taken and does not confirm current progress.

Access from the main boulevard and the riverfront road

By contrast, Palm River is located inside the Palm City urban area along the Giong Ong To River in Binh Trung Ward, Thu Duc City. Surrounded by a natural river branch, the site sits away from traffic noise on major roads. Residents connect to main arteries via the HCMC – Long Thanh – Dau Giay Expressway parallel road.

Palm River vs Eaton Park: daytime rendering of Palm River towers
Daytime rendering of the Palm River towers; this is an architectural illustration rather than a photo of a completed site.

Impact of the An Phu Interchange on travel

For regional connectivity, both projects benefit from the An Phu Interchange project. Once completed, this interchange will reduce traffic conflicts between vehicles moving from the expressway onto Mai Chi Tho Boulevard and Luong Dinh Cua Street. Travel between Binh Trung Ward and central city districts during peak hours will become more convenient.

Palm River vs Eaton Park: scale and architectural design

The two projects follow different architectural approaches that reflect each developer’s spatial planning:

Eaton Park: 6 high-rise towers on Mai Chi Tho Boulevard

Eaton Park is planned on a 3.7 ha site with 6 towers ranging from 29 to 39 storeys, comprising 1,968 apartments, 52 podium shops, and 20 shophouses. Apartment doors and windows use aluminium frames with Low-E heat-insulating glass according to the project’s Phase 3 documents. Living room and bedroom ceilings are 3 m high per technical records. The unit mix ranges from 1-bedroom to 3-bedroom apartments and duplexes.

Two Eaton Park towers and the front building block
Eaton Park towers viewed across the front building block, from the project library.

Palm River: riverfront apartments in Palm City

Palm River focuses on riverfront living along the Giong Ong To River. Its show unit gallery is on the expressway parallel road in Palm City, Binh Trung Ward, Thu Duc City, open daily from 08:00 to 20:00 since 18/09/2026. The gallery displays two show units: an 85 m² 2-bedroom corner unit and a 157 m² 3-bedroom corner unit. The floor plans are oriented to catch natural breezes from the Giong Ong To River. See more at the Palm River show units (Vietnamese).

Palm River vs Eaton Park: on-site amenity spaces

On-site amenities at the two projects are planned around their respective sites:

At Eaton Park, Gamuda Land’s Phase 3 documents place service utility rooms, a swimming pool, and landscaped gardens on Level 3 for residents. Residents also have access to community spaces and a walking path along the Ba Dat canal.

At Palm River, amenities are planned alongside green spaces and the natural water frontage of the Giong Ong To River within Palm City. Buyers can view the architectural scale model at the Sales Gallery to see the layout of water features and internal walking paths.

Rendering of the elevated Onsen area at Palm River
Rendering of the elevated Onsen area at Palm River; amenity design illustration.
Palm River vs Eaton Park: Eaton Park apartment interior rendering
Eaton Park interior rendering with outward-facing glass windows, for layout reference.

Palm River vs Eaton Park: prices and payment policies

Purchase costs and payment schedules are important factors to compare between the two developments:

Indicative price per square metre at each project

Primary market Eaton Park prices (Vietnamese) currently range from about 125 to 150 million VND/m². This unit rate reflects the Mai Chi Tho Boulevard frontage and Gamuda Land’s handover specifications.

At Palm River, indicative prices start from about 145 million VND/m² based on gross area (excluding VAT, maintenance fees, and discounts). Two-bedroom units start from 12.29 billion VND and 3-bedroom units from 17.85 billion VND; details are available in the Palm River inventory (Vietnamese).

How does Gamuda Land’s payment policy at Eaton Park work?

Gamuda Land applies sales policy 26.1 from 26/10/2026 to primary inventory at Eaton Park, with 5 payment methods. Method 1 requires 10% at contract signing. Method 4 uses a 60% bank loan: buyers pay 5% at signing and receive interest support of up to 7%/year for 24 months, with a principal grace period of up to 24 months (limited slots). Method 5 spreads payments over 5 years.

For the Palm River sales policy (Vietnamese), general inventory packages offer discounts of 11% under the standard plan, 6.5% under the special plan, and 13% under the fast-payment plan. The loan plan includes 0% interest support for 24 months and a principal grace period of 36 to 60 months (the 60-month term applies to buyers with income meeting OCB’s priority-income criteria).

Reference diagram of Palm River payment methods
Reference diagram of payment methods for the Palm River project.

Under the general-inventory policy applicable from 13 November 2026, buyers contribute 25% and banks finance up to 75%. Bank disbursements comprise 55% at SPA signing, 15% at handover and 5% upon ownership certificate issuance. This differs from the earlier diagram displayed here. Principal grace is 36–60 months; the 60-month term requires income meeting OCB’s priority-income criteria.

Palm River vs Eaton Park: construction progress and handover dates

Actual site progress helps buyers align handover dates with their personal financial plans.

Eaton Park topped out its final two towers on 12/08/2026, completing the structural framework for all 6 towers. This milestone was reported by Vietnam Law Newspaper and Tien Phong Newspaper, with handover expected in Q2/2027 for towers A5-A6 and Q1/2028 for towers A1-A4. Site observations on 23/09/2026 show that towers A1 and A2 have completed exterior facades and are undergoing landscaping work, while towers A3 and A4 are in the exterior finishing stage; see details in the Eaton Park construction update (Vietnamese).

At Palm River, the developer opened the show units on 18/09/2026 for visitors. According to the project page, handover is expected in Q1/2029.

Palm River vs Eaton Park: which project suits which buyer?

DND Realty recommends basing your decision on actual housing needs and required move-in timelines:

Eaton Park suits buyers who:

  • Prefer living directly on Mai Chi Tho Boulevard.
  • Commute regularly to the Thu Thiem urban area or central Ho Chi Minh City.
  • Need handover starting in 2027 following the completed structural topping-out.

Palm River suits buyers who:

  • Prioritise a riverfront environment along the Giong Ong To River in Binh Trung Ward.
  • Look for a quieter waterfront setting inside the Palm City urban area.
  • Have a longer-term financial plan and want to inspect show units in person before booking.

Palm River vs Eaton Park: planning documents for reference

For a broader view of the East Ho Chi Minh City apartment market, review the following planning analyses:

Palm River vs Eaton Park: frequently asked questions

Legal status and handover schedule of each project

How far apart are Palm River and Eaton Park?
Both projects are in East Ho Chi Minh City and connect via Mai Chi Tho Boulevard and the expressway parallel road. Actual travel time depends on traffic volume at the time of travel.
Are the legal documents for Palm River and Eaton Park complete?
Eaton Park holds Land Use Rights Certificate No. DI 013041 and completed the structural framework of all 6 towers on 12/08/2026. For Palm River, buyers should contact the official distribution agency to inspect approved legal documents directly.
Which project has better rental potential?
Both projects are still under construction and have not handed over apartments, so there is no actual market rental data yet. Buyers should evaluate boulevard-front versus riverfront locations against their own financial plans.

Handover specifications and bank loan policies

Which project offers a more spread-out payment schedule?
Eaton Park applies sales policy 26.1 from 26/10/2026, including a 5-year payment method and a 60% loan method with interest support of up to 7%/year for 24 months. Palm River applies its general inventory policy: 11% off under the standard plan, 6.5% under the special plan, and 13% under the fast-payment plan; the loan plan includes 0% interest support for 24 months and a principal grace period of 36 to 60 months (the 60-month term applies to buyers with income meeting OCB’s priority-income criteria).
What are the handover specifications at Eaton Park and Palm River?
At Eaton Park, Phase 3 documents specify Low-E heat-insulating glass for doors and windows; the brand list applies to tower A4 (with an “or equivalent” clause), while other towers follow the sale and purchase agreement appendix for each unit. At Palm River, detailed finishing specifications will be published in the sale and purchase agreement appendix.

Visiting the show units of both projects

Where can I register to visit the show units for both projects?
The Eaton Park show gallery is open daily from 08:30 to 18:30 at the project site. The Palm River show gallery is on the expressway parallel road, Palm City urban area, Binh Trung Ward, Thu Duc City, open daily from 08:00 to 20:00. Contact DND Realty via Hotline/Zalo 0906.873.708 to arrange a visit.
DND

Advice from DND Realty’s property specialists

Buyers should choose between the Mai Chi Tho Boulevard frontage at Eaton Park and the Giong Ong To riverfront setting at Palm River based on their household’s daily routine. Check construction progress and legal documents before deciding.

Hotline/Zalo: 0906.873.708 · Email: info@dndrealty.com.vn
Address: 60 Phan Bá Vành, Thanh My Loi Ward, Ho Chi Minh City
Zalo ZALO +84 906 873 708