Narra Residences construction progress surveyed on 04/11/2026 confirms that one tower has reached Level 21. Previously, on 29/10/2026, general contractor Ricons completed the concrete pour for the Level 20 transfer slab, executing this structural milestone across both towers N1 and N2.

  • Site status: One tower has reached Level 21; both towers N1 and N2 have executed the Level 20 transfer slab structure.
  • General contractor: Ricons Construction Investment Joint Stock Company (Ricons).
  • Project scale: 2 towers (N1 and N2) rising 29 storeys with 278 apartments, within Zone MU8 Empire City.
  • Current legal status: Document No. 2849/SXD-PTDT dated 10/07/2026 from HCMC Department of Construction confirming eligibility for off-plan housing sales.
  • Handover milestone: Expected fourth quarter of 2027 (expected Q4/2027).
  • English advisory: Contact DND Realty on 0906.873.708 to check foreign quota availability and arrange site consultations.
Updated: 09/11/2026 · Source: Ricons engineering notices, DND Realty site surveys, and Department of Construction documents

Construction activity at Zone MU8 in Thu Thiem maintains steady momentum. A field survey on 04/11/2026 at the Narra Residences project confirmed that one tower has reached Level 21. This update enables purchasers to monitor core structural milestones and the anticipated handover trajectory.

Narra Residences construction progress in November 2026: On-site verification

Entering November 2026, the construction site across Zone MU8 maintains active progress. Specialized machinery alongside engineers and site crews work continuously to advance structural milestones.

Narra Residences construction progress on 04/11/2026 at the tower displaying project signs
Close-up of the tower displaying signage for Narra Residences, Empire City, and Ricons; lower levels show exterior glazing installation underway. Photo taken by DND Realty on 04/11/2026

Site status on 04/11/2026: One tower reaches Level 21

On 04/11/2026, DND Realty surveyed the site and recorded that one tower has reached Level 21. Both towers N1 and N2 are secured with blue safety netting. Signage boards for Narra Residences, Empire City, Ricons, and BM Windows Façade are mounted on the tower structure.

Lower floors show the installation of exterior window frames and glazing. Two tower cranes and construction hoists operate continuously to transport materials to upper levels.

Narra Residences construction site viewed from the internal access corridor in Thu Thiem
Narra Residences construction site viewed from the access road with regular traffic flow. Photo taken by DND Realty on 04/11/2026

Observed from the access road leading to the site, motorcycle and car traffic flows steadily.

Level 20 transfer beam and slab pour on 29/10/2026

Prior to the field survey, general contractor Ricons completed a major structural milestone. On 29/10/2026, crews placed concrete for the Level 20 transfer slab. This marks the second transfer slab in the project, following the Level 3 transfer slab completed earlier.

The pour mobilized over 500 m³ of concrete placed continuously over 6 hours. Heavy structural transfer beams on Level 20 reach 2.5 m in height. Both towers N1 and N2 have executed this transfer slab structure according to Ricons technical releases.

Narra Residences progress during night-time elevated slab construction
Night-time structural slab construction with tower cranes, concrete boom pump, and the Saigon River in the background. Photo: Ricons
Workers operating concrete boom pump on the elevated tower deck of Narra Residences
Workers and concrete pump operating on the tower slab at night. Photo: Ricons

Photographs from the upper structural deck show night-time engineering operations, with boom pumps and tower cranes working against the lights of the eastern riverbank.

Elevated amenity cluster and high-rise apartment floors in Narra Residences progress

Completing the Level 20 transfer structure prepares the towers to advance through the upper apartment levels, having passed the elevated lifestyle amenities on Levels 18 and 19.

Brochure materials indicate that Level 18 houses the Sky Bowling facility and Resident’s Lounge. Level 19 incorporates an infinity swimming pool, fitness gym, and yoga area. Upper-zone residential units span Levels 20 to 27, topped by Level 28 penthouses with private sky terraces.

Overview of Narra Residences construction progress facing towards the District 1 centre
Towers rising with central district skyline in the background. Photo: Ricons

Buyers evaluating upper-floor residences may consult DND Realty for layout comparisons, unit orientations, and current secondary market listings.

Legal status and expected handover schedule for Zone MU8

Regarding statutory foundations, the Ho Chi Minh City Department of Construction issued Document No. 2849/SXD-PTDT on 10/07/2026, confirming that 278 apartments in Zone MU8 satisfy conditions for off-plan housing sales.

Project handover is expected in the fourth quarter of 2027 (expected Q4/2027). The developer has not released official primary price lists or promotional policies.

Key milestones to track during Narra Residences construction

In coming months, purchasers should monitor two primary milestones. First is structural framing from Level 21 through Level 28 leading up to the topping-out milestone.

Second is the progression of exterior facade glazing from lower podium floors upward. Buyers may also review handover timelines across completed Keppel Land developments in the eastern district.

Frequently asked questions about Narra Residences progress

DND Realty addresses key questions from purchasers regarding construction at Zone MU8:

What level has Narra Residences reached as of November 2026?
On 04/11/2026, DND Realty recorded that one tower has reached Level 21. Previously, on 29/10/2026, general contractor Ricons poured the Level 20 transfer slab continuously over 6 hours; both towers N1 and N2 have executed this transfer slab structure.
When is apartment handover expected at Narra Residences?
Narra Residences targets an expected handover in the fourth quarter of 2027 (expected Q4/2027). The binding handover timeframe for an individual unit is defined in the Sale and Purchase Agreement.
What is the current legal status of Narra Residences?
On 10/07/2026, the HCMC Department of Construction issued Document No. 2849/SXD-PTDT confirming that all 278 apartments in Zone MU8 (Narra Residences) are eligible for off-plan housing sales.
On which floors are the elevated amenities located?
Brochure layouts show elevated lifestyle amenities on Levels 18 and 19. Level 18 features the Sky Bowling alley and Resident’s Lounge; Level 19 incorporates an infinity pool, gym, and yoga area.
Who is the general contractor for Narra Residences?
Ricons Construction Investment Joint Stock Company (Ricons) serves as the general contractor constructing the superstructure of Narra Residences at Empire City Thu Thiem.

Explore more projects with DND Realty

For strategic perspective on Thu Thiem master planning and prime apartment developments in 2026, explore these related project guides:

To request certified legal documents or dated site photographs for Narra Residences, contact DND Realty hotline 0906.873.708. An English-speaking adviser will respond within the same business day.

DND

Professional guidance from DND Realty property advisers

Narra Residences has completed the key Level 20 transfer slab milestone to advance into the upper apartment levels. Buyers evaluating secondary transactions should verify individual unit codes against on-site structural progress and cash flow plans ahead of the expected Q4/2027 handover.