Palm River Construction Progress – November 2026: Bored Piling and Riverside Foundation Works
Content reviewed by Ms Lê Hiền, co-founder of DnD Realty with more than 10 years in high-end property.
Palm River Construction Progress – November 2026: Bored Piling and Riverside Foundation Works
Palm River construction in November 2026 is actively advancing foundation works across its 1.9-hectare riverside site in Palm City. The general contractor operates heavy crawler cranes, specialized bored piling rigs, and bentonite silos. Foundation completion is scheduled for the first quarter of 2027, with official apartment handover expected in the first quarter of 2029.
- Developer: Huong Viet Properties.
- Location: Palm City Urban Area, Song Hanh Road, Binh Trung Ward, Ho Chi Minh City.
- Scale: 1.9 hectares, 4 residential towers rising 35 to 36 storeys, 620 apartments, 13 retail shop units, and 2 basements.
- Latest Structural Status: Mass bored piling, barrette diaphragm wall construction, pile load testing, and bentonite silo mixing operations.
- Expected Handover: Expected in the first quarter of 2029 (Q1/2029) according to official project planning.
November 2026 update: bored piling and foundation operations along Giong Ong To river
Field survey data from November 2026 indicates strong mobilization across the entire Palm River site. The 1.9-hectare parcel has been fully leveled, secured by brand-identity perimeter fencing, and equipped with automated security access gates. Along the natural bend of the Giong Ong To River, construction crews are executing barrette diaphragm walls and foundation piles.
Heavy drilling rigs and bentonite plant setup
The contractor has deployed heavy crawler cranes with capacities between 80 and 100 tons alongside multiple drilling rigs at designated tower footings. Work crews are conducting pile load tests while advancing the perimeter retaining wall. Near the site boundary, a two-story blue-roofed site management office operates continuously.

Facing the waterfront, an orange cylindrical bentonite silo mixing station supplies slurry to stabilize deep boreholes. This system supports both mass bored pile drilling and barrette wall excavation. Crushed stone access roads allow supply trucks and concrete mixer vehicles to circulate without interrupting operations.

Steel rebar fabrication and site preparation
On the active working platform, red drilling rigs work with green crawler cranes to lower steel casing pipes into position. These steel casings secure accurate pile centerlines and prevent surface soil collapse during deep drilling. Steel rebar cages are assembled and welded on site under engineering design standards.

Crawler cranes hoist the assembled cylindrical steel cages directly into the drilled boreholes prior to concrete placement. Equipment is positioned to maintain a safe working buffer from neighboring Palm City townhouses. The site team is currently arranging heavy equipment to prepare for top-down excavation across two basement levels.

October 2026 update: foundation work and riverside park groundbreaking
During October 2026, site activities concentrated on mass bored piling for the residential towers. Equipment was arranged to establish clear footprints for Tower T3 and Tower T4 on the river-facing side of the parcel. Meanwhile, surrounding township amenities reached an important construction start.
Riverside tower locations and Palm City park commencement
On October 08, 2026, Palm City officially broke ground on Phase 1 of its riverside public park and promenade. This green corridor extends directly along the Giong Ong To riverbank, fronting the Palm River residential parcel. Furthermore, Huong Viet Properties hosted an apartment matching event on the morning of October 15, 2026.

The October survey verified the connection between Palm River and existing developments in Palm City. The project borders established Palm Heights residential towers to the west and low-rise townhouses to the north. Dedicated site roads provide direct access to the Song Hanh parallel highway.

Construction milestones of Palm River
DND Realty tracks the cumulative construction timeline of Palm River from project launch to anticipated completion:
| TIMELINE | CONSTRUCTION WORK ON SITE | STATUS |
|---|---|---|
| November 2026 | Mass bored piling, operating 80 to 100 ton crawler cranes, orange bentonite silos, barrette diaphragm wall construction, and pile load testing. | Ongoing |
| October 2026 | Continuous bored piling at Tower T3 and T4 footprints; groundbreaking of Phase 1 riverside park and promenade on October 08, 2026. | Completed |
| September 2026 | Mass bored piling across tower locations and regular operation of bentonite mixing silos. | Completed |
| August 2026 | Ground leveling completed for the 1.9-hectare site and D-Wall diaphragm wall construction initiated along the riverbank. | Completed |
| July 2026 | Project ground launch, perimeter safety hoarding installation, electrical lines setup, and site office establishment. | Completed |
| Q1/2027 (Expected) | Completion and inspection of foundation structure and 2 basement levels, qualifying for official SPA signing. | Scheduled Target |
| Q1/2028 (Expected) | Structural concrete completion and topping out of all 4 residential towers. | Future Target |
| Q1/2029 (Expected) | Architectural finishing, landscape amenities completion, and apartment handover to residents. | Scheduled Target |
Expected handover schedule and contract milestones
Under developer planning, foundation and basement inspection is targeted for the first quarter of 2027. Meeting this statutory milestone will allow the developer to issue official Sale and Purchase Agreements (SPA). Buyers who selected units during the October 2026 matching event can use this schedule to plan upcoming payment obligations.
The structural superstructure is scheduled to top out in the first quarter of 2028. Following exterior and interior finishing, handover of finished residential units is expected in the first quarter of 2029 (Q1/2029). These milestone projections remain subject to formal written notifications from Huong Viet Properties.
Explore more projects with DND Realty
Updated 16.11.2026Palm River Project OverviewPalm River at Palm City, Binh Trung Ward, Thu Duc: 1.9 ha with 4 towers of 35–36 storeys and 704 units, Onsen and sky-level amenities, plus legal status and construction progres…Read in Vietnamese
Updated 21.10.2026Palm Heights Apartment ProfilePalm Heights in Palm City, District 2: Handed over with vibrant expat community, 2BR 77 m² unit at VND 7.5B all-in, 50m resort pool. Hotline 0906.873.708.Read in Vietnamese
Updated 20.11.2026The Prive Project OverviewRead in Vietnamese
Updated 11.11.2026Eaton Park Gamuda Land Project GuideEaton Park foreign buyer guide: 3.7 hectares, six towers, 1,968 apartments, ownership notes, legal documents and construction progress. DND Realty 0906.873.708.Read in Vietnamese
Updated 14.11.2026Palm River vs Eaton Park ComparisonPalm River vs Eaton Park in East HCMC: compare riverfront and Mai Chi Tho locations, prices from 125-150 million VND/m², legal files, and 2027 handover.Read in Vietnamese
Updated 18.11.2026Palm River vs The Prive ComparisonPalm River vs The Privé in Nam Rach Chiec: compare 5%-10% upfront equity, MB Bank loans, 13%-23.5% fast-payment discounts, and Q3/2027 handover dates.Read in Vietnamese Frequently asked questions about Palm River progress
What is the current construction progress of Palm River in November 2026?
As of November 2026, Palm River is conducting mass bored piling, barrette diaphragm wall installation, and pile load tests using 80 to 100 ton crawler cranes and an active bentonite slurry plant.
When is Palm River expected to complete the foundation and sign official sale contracts?
Foundation and basement inspection is targeted for the first quarter of 2027 (Q1/2027), which will allow official Sale and Purchase Agreements (SPA) to be executed under statutory requirements.
What is the expected handover timeline for Palm River apartments?
Apartment handover is projected for the first quarter of 2029 (Q1/2029) based on the official project master schedule published by Huong Viet Properties.
Where are the Palm River sales gallery and show units located?
The Sales Gallery and show units are on Song Hanh Road, Palm City Urban Area, Binh Trung Ward. They open daily from 08:00 to 20:00, with a 2-bedroom (85 sqm) and a 3-bedroom (157 sqm) model apartment.
How does DND Realty support international buyers monitoring construction from abroad?
DND Realty delivers monthly high-resolution flycam video records, photographic updates, and virtual show unit walk-throughs for overseas clients via WhatsApp and direct consultation.
Consult with DND Realty property advisors
DND Realty continuously tracks on-site development across Nam Rach Chiec and East Ho Chi Minh City. International buyers seeking project documents or virtual site consultations can connect directly with our advisory team.